Soil Test was carried out
Digging of drilling pit
Drilling of pile point
Excavation of 1m and showing of blinding
Pile Integrity Test was carried out
Cracking of bore pile
Iron bending works
Tower Inventory
Riggers erecting the tower at different height
Picture showing 45m Erected
Installation of ladder
Surface preparation
Tower Priming
Riggers painting the tower from top to bottom
Aviation light installed on Tower
Thunder arrestor installed on Tower
Resting platform installed
Schmidt Hammer (Rebound) Test was carried out